Skip to content
Dymond Engineering
Dymond Engineering
Dymond EngineeringDymond Engineering
01271 372662Email Us
  • Projects
    • Shop Fittings
      • Bespoke Shop Fittings
        • Taking Shape Case Study
        • Warren Trading Co Case Study
        • Lapstone Case Study
      • Retail Display Systems
        • LC Waikiki Case Study
    • Contract Furniture
    • Homeware Furniture
      • Metal Frame Designer Bookcase Case Study
    • Fixtures and Fittings
      • Woolacombe and Mortehoe Display – Case Study
      • Sanitiser Stands
    • Eezee Glide Rock N Roll Bed Frames
    • Campervan Metal Bed Frames
    • Fitness Equipment
    • Game Bird Feeders
  • Wood and Metal Capabilities
    • Value and Design Engineering
    • Metal Laser Cutting
    • CNC Wood Cutting
    • Materials – Wood and Substrates
    • Materials – Steel
    • Wood Finishing
    • Powder Coating and Metal Finishing
    • Metal Forming
    • Punch Press
    • Welding
    • Contract Furniture
    • Custom Desks
  • About us
    • Testimonials
  • Gallery
  • News
  • Contact Us
  • Projects
    • Shop Fittings
      • Bespoke Shop Fittings
        • Taking Shape Case Study
        • Warren Trading Co Case Study
        • Lapstone Case Study
      • Retail Display Systems
        • LC Waikiki Case Study
    • Contract Furniture
    • Homeware Furniture
      • Metal Frame Designer Bookcase Case Study
    • Fixtures and Fittings
      • Woolacombe and Mortehoe Display – Case Study
      • Sanitiser Stands
    • Eezee Glide Rock N Roll Bed Frames
    • Campervan Metal Bed Frames
    • Fitness Equipment
    • Game Bird Feeders
  • Wood and Metal Capabilities
    • Value and Design Engineering
    • Metal Laser Cutting
    • CNC Wood Cutting
    • Materials – Wood and Substrates
    • Materials – Steel
    • Wood Finishing
    • Powder Coating and Metal Finishing
    • Metal Forming
    • Punch Press
    • Welding
    • Contract Furniture
    • Custom Desks
  • About us
    • Testimonials
  • Gallery
  • News
  • Contact Us

Monthly Archives: January 2021

You are here:
  1. Home
  2. 2021
  3. January

Testing of our Total Training Tower Safety Bar

Heavy Load testing the TX3

TX3 Weight Training Tower, Weight training towerBy Sue RobertsJanuary 27, 2021

Load testing the TX3 Total Training Tower in North Devon   Heavy load testing the TX3 Total Training Tower and pull up bars following the positive endorsement of our new fitness tower from para-canoeist Jack Eyers. We have now successfully completed the initial testing of our TX3 Total Training Tower. TX3 Tested by Jack Eyers…

  • TERMS AND CONDITIONS
  • PRIVACY NOTICE
  • COOKIE POLICY
Footer Menu

@ Copyright 2023 Dymond Engineering

Go to Top
Close
Close

Close

Close

Close